Solution Description
OEM manufacturer offer pullys
Product Name | Casting solid iron grey/ductile iron/stainless metal/carbon steel products |
Material | Ferrous resources:solid iron, grey iron, ductile iron, austempered ductile iron , carbon metal,stainless metal, reduced alloy steel, large chromium/manganese steel Non-ferrous: aluminum alloy, copper alloy,brass, bronze titanium alloy(getting created) |
Process | Missing foam casting,Resin sand casting, CNC machining |
Equipment | Molding device, dropped foam casting creation line, CNC machining centre, common device tools,CNC laser chopping machine,massive-scale push device |
Finish | zinc phosphide, zinc plating, hot dip galvanized, e-coating, spray paint, black oxide coating ,anodized,passivation and other folks |
Testing CZPT | Spectrum analyzer, tension tester, hardness tester, a few coordinates measuring instrument, caliper, micrometer, dial gauge, microscope, roughness tester, salt spray screening device, ultrasonic flaw detector, X-ray detection equipment, magnetic particle flaw detector, air tightness screening device, thickness gauge |
Product Application | Engineering & mining operates |
Other primary casting products | Auto areas,large mining gear equipment, CZPT equipment components, valve areas, large diameter pipe fittings, , agricultural equipment elements,construction equipment, CZPT ,entire body situation and so on. |
Manufacturing facility
Inspection Instruments
Certifications
FAQ
1.How can I get the quotation?
Make sure you give us your drawing,amount,fat and materials of the product.
2.If you will not have the drawing,can you make drawing for me? Of course,we are in a position to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your primary order time? Sample time: 35-40 times after start to make mould. Order time: 35-40 times, the accurate time is dependent on merchandise.
4.What is your payment strategy? Tooling:one hundred% T/T CZPT d Get time:fifty% deposit,fifty%to be paid out ahead of shipment.
five.Which type of file format you can go through? PDF, IGS, DWG, CZPT , MAX
6.What is your surface treatment? Including: powder coating, sand blasting, portray, polishing, acid pickling, anodizing, enamel, zinc plating, scorching-dip galvanizing, electrophoresis, chrome plating.
seven.What is your way of packing? Generally we pack items in accordance to CZPT ers’ demands.
Set up 1.1. Clean all oil, filth and paint from shafts, bushing holes, bushing exterior and holes of factors (sprockets, pulleys, and many others.). Insert the bushing into the assembly. 3. Match the pattern of holes, not threaded holes (every gap is threaded on 1 aspect only). Insert the socket head cap screws or screws into the fifty percent-threaded holes shown in the picture below. Install the assembly on the shaft. 4. Change the torque environment or go over screw* to the advisable torque environment in the diagram underneath. Fill any unfilled holes with grease.